The one number no single builder gives you — total electrical load across video, audio & lighting, balanced across phases, sized to distro / generator / drops. Enter quantities; per-item wattages are editable defaults.
Video SDI / LED / projection
Audio amps · PA
Lighting fixtures · dimming
Other comms · staging · misc
Service & distribution
Total connected load
0.0kW avg
peak ~0 kW
Total current0 A
20A circuits0
Generator (min)0 kVA
Video / Audio / Ltg0 / 0 / 0
⚠ Estimate for planning — confirm real nameplate draw, keep each phase within ~80% of breaker, and have an electrician sign off tie-ins. Movers, LED walls & strobes have high inrush; peak sizes the breakers/genny.